Biogas upgrading · Commissioning Netherlands

Recommissioning of a biogas upgrading plant

A biogas upgrading plant had to be recommissioned and prepared for the 24-hour test for grid injection.

What AMB did: AMB recommissioned the plant, traced and resolved the faults that held up the test, and arranged the required parts on the same day.

Test-readyPlant ready for the 24-hour test
CO₂ · Overhaul Germany

Overhaul of a CO₂ compressor

The compressor of a liquid CO₂ plant was due for an overhaul.

What AMB did: AMB overhauled the compressor, fixed a leak during start-up and brought the plant back into operation together with the supplier.

RunningPlant handed over in operation, with advice for follow-up maintenance
Biogas · Maintenance

Maintenance on two compressors

At a biogas plant, a high-pressure compressor and a biogas compressor were due for maintenance.

What AMB did: AMB serviced both compressors, replaced parts and improved the settings. A missing part came from our own stock.

RestartedBoth compressors back in operation without problems
Biogas upgrading · Fault diagnosis Netherlands

Pressure fluctuations at a flare resolved

Pressure fluctuations caused the flare of a biogas plant to switch on and off repeatedly, and the plant did not run stably.

What AMB did: Together with the suppliers involved, AMB found the cause, adjusted the control and got the plant running stably again.

StableFlare and plant running smoothly again
Refrigeration · Repair

Repair of a chiller at a gas scrubber

The chiller that cools the gas at a gas scrubber had a refrigerant leak.

What AMB did: AMB fixed the leak, recharged and adjusted the chiller, and assisted with a modification to the gas analysis.

RepairedThe chiller is cooling steadily again
Biogas upgrading · Optimisation

More stable gas upgrading

A biogas upgrading plant could not keep the gas quality stable.

What AMB did: AMB investigated the causes, improved the control at several points and agreed concrete next steps with the client.

More stableControl improved, next steps agreed

Want to know more about one of these projects? Feel free to call us, we are happy to tell you more.

06 57 38 87 61

Contact

Do you recognise one of these situations?

Describe what's going on. AMB will take a look and come back with a concrete approach, without any obligation.

Call Email WhatsApp